Friday, April 9, 2010

Construction Advances



April 7th , 2010








Met with our GM and Frank and I were astonished at the progress. All gas and plumbing lines were complete and the finishing touches on the drywall were going into place. All phone lines were wired and the concrete was filled in where the dug the grease pit trench.




Man the place looks incredible even without the finshes. A/C and tiled kitchen floors are next.